|
|
| Address | 24-4,Shinkawa 1-Chome,Chuo-ku,Tokyo,104-8289 Japan | |||||||||||||||
| Tel | +81-3-3297-7008(Overseas Branch) | |||||||||||||||
| Fax | +81-3-3553-6935 | |||||||||||||||
| Home-page Address | ENGLISH http://www.daiho.co.jp/english/index.htm JAPANESE http://www.daiho.co.jp/index.htm |
|||||||||||||||
| overseas@daiho.jp | ||||||||||||||||
| Established | March 31,1949 | |||||||||||||||
| Representative | CEO: | Yauhide OKAMURA | COO: | Hisao MIZUSHIMA | ||||||||||||
| Main Business Line | engineering • construction | |||||||||||||||
| Overseas Offices | Taiwan: | 10F ROOM 3,NO.31-1,SEC.2,NSIN HSENG N.ROAD,TAIPEI,TAIWAN,R.O.C TEL:+886-2-2562-4070@FAX:+886-2-2536-1263 |
||||||||||||||
| Bangkok: | NO.65,42 TOWER 19TH FLOOR,ROOM 1901,SOI SUKHMVIT ROAD,BANGKOK,10110 THAILAND TEL:+66-2-712-2539@FAX:+66-2-712-2540 |
|||||||||||||||
| Madagascar: | LOT ‡U M45C,ANDRIANALEFY,ANDROHIBE B.P.6029 ANTANANARIVO 101,MADAGASCAR TEL:+261-20-22-536-39@FAX:+261-20-22-536-40 |
|||||||||||||||
| Malaysia: | 19-2,JALAN ARA SD 7/3B,BABDAR SRI DAMANSARA,52200 KUALA LUMPUR TEL:+603-6273-3369@FAX:+603-6273-3370 |
|||||||||||||||
| Cambodia: | HOUSE NO.1375,SANGKAP CHAK ENGRE,PHNOM PENH,KINGDOM OF CAMBODIA TEL:+(855)23-214-509@FAX:+(855)23-214-509 |
|||||||||||||||
| Dubai: | C/O AL SHAFAR GENERAL TRADING MEZZANINE FLOOR,NEXT TO MINISTRY OF HEALTH,OPP TO BURJUMAN CENTRE AL-SHAFAR BUILDING,BUR DUBAI,EMIRATE OF DUBAI,UAE TEL:+971-4-396-9999@FAX:+971-4-397-8888 |
|||||||||||||||
| Major Projects (Domestic) |
Shield Tunnel Work for Tohbu Kyuryo Railway Line The Tohbu Kyuryo Railway Line links key stations of Higashiyama Line penetrating center of Nagoya City and Aichi Circular Line by linear motor system.There are sites of EXPO 2005 Aichi along the Railway Line. Total length of the Line is approx.9km with 9stations.Our shield tunnel site is located in the congested outskirts of Nagoya City.Judging from underground • above ground geological conditions and existing underground structures,the employer Aichi Prefectural Government came to conclusion that DOT (Double O Tube) method is most suitable.Tunneling details are; 1) Total Tunnel Length:905m 2) Dimension of Tunnel Section: ƒÓ6.73m~W11.43m 3) Excavation Volume:58,500m3 4) Reinforced Concrete Segment: 5) Ductile Segment:W600;206 rings 6) Construction Time:August 2003 - March 2005 (19 months) ![]() |
|||||||||||||||
| Major Projects (Abroad) |
Taiwan High Speed Rail Project Taiwan High Speed Rail Project,which links Taipei and Kaohsiung (350km) in 90 minutes,has been implemented under the largest BOT scheme in the world introducing the latest Japan's Shinkansen technologies. Whole civil works of the Project were ordered to major international contractors dividing into 12 sections in the year 2000. 1 Site Location:80km from Taipei City,Hsin Chu Prefecture 2 Section Length:17.78km 3 Client:Taiwan High Speed Rail Corporation 4 Type of Contract:Design • Build 5 Design • Construction Time:April 2000 - July 2004 (52 months) 6 Works:
| |||||||||||||||