|
|
|
| Address | 2-2-2 Matsuzaki-cho,Abeno-ku,Osaka 545-8555 | |
| Tel | +81-6-6621-1101 | |
| Fax | +81-6-6623-7692 | |
| Home-page Address | http://www.okumuragumi.co.jp/en | |
| − | ||
| Established | February 22,1907 | |
| Representative | President and Representative Director Takanori Okumura | |
| Main Business Line | overall construction and related businesses | |
| Overseas Offices | Taiwan Branch 13F-5 Da-an Metro,No.6,Sec.4,Shinyi Rd.,Taipei,Taiwan 106,R.O.C TEL:+886-2-2709-6895 |
|
| Hanoi Rep.Office No16,Lane111,Nguyen Phong Sac Street,Cau Giay District,Hanoi,Vietnam TEL:+84-4-754-9474 |
||
| Major Projects(Domestic) | ・ | Onita Dam Completed in 2001 |
| ・ | The second Tomei Expressway Mikkabi Tunnel Completed in 2005 |
|
| ・ | Metropolitan Subway route No.12 Monnaka,Tsukishima section construction project Completed in 2000 |
|
| ・ | Metropolitan Expressway central circular Shinjuku route between construction sections SJ51 to SJ53 completed in 2005 |
|
| ・ | Mielparque-Nagano (Nagano Postal Savings Hall) Completed in 1997 |
|
| ・ | Iwate prefectural Nankou Hospital(seismic isolation technology) Completed in 2006 |
|
| Major Projects(Abroad) | ・ | Sarawak Malaysia Batang Ai Hydroelectric Power Plant Contract C2 Completed in 1985 |
| ・ | Hong Kong Mass Transit Railway Contract 410 Completed in 1985 |
|
| ・ | Singapore Mass Rapid Transit Contract 303 Completed in 1989 |
|
| ・ | Kaohsiung,Taiwan MRT Contract CR6 Completed in 2008 |
|
| ・ | Taipei,Taiwan MRT Contract CG590B Scheduled for completion in 2014 |
|
| ・ | Taoyuan,Taiwan MRT Contract CU02A Scheduled for completion in 2011 |
|