What Is OCAJI?

Member List

Members

Daiho Corporation
Address
24-4, Shinkawa 1-Chome, Chuo-ku, Tokyo, 104-8289 Japan
Tel
+81-3-3297-7008 (Overseas Branch)
Fax
+81-3-3553-6935
Home-page Address
http://www.daiho.co.jp/english/index.htm
e-mail
overseas@daiho.jp
Established
March 31, 1949
Representative
CEO:Yauhide OKAMURA COO:Hisao MIZUSHIMA
Main Business Line
engineering & construction
Overseas Offices
Taiwan:10F ROOM 3, NO. 31-1, SEC. 2, NSIN HSENG N. ROAD, TAIPEI, TAIWAN, R.O.C
TEL: +886-2-2562-4070, FAX: +886-2-2536-1263
Bangkok:NO. 65, 42 TOWER 19TH FLOOR, ROOM 1901, SOI SUKHMVIT ROAD, BANGKOK, 10110 THAILAND
TEL: +66-2-712-2539, FAX: +66-2-712-2540
Madagascar:LOT Ⅱ M45C, ANDRIANALEFY, ANDROHIBE B.P.6029 ANTANANARIVO 101, MADAGASCAR
TEL: +261-20-22-536-39, FAX: +261-20-22-536-40
Malaysia:19-2, JALAN ARA SD 7/3B, BABDAR SRI DAMANSARA, 52200 KUALA LUMPUR
TEL: +603-6273-3369, FAX: +603-6273-3370
Cambodia:HOUSE NO.1375, SANGKAP CHAK ENGRE, PHNOM PENH, KINGDOM OF CAMBODIA
TEL: +(855) 23-214-509, FAX: +(855) 23-214-509
Dubai:C/O AL SHAFAR GENERAL TRADING MEZZANINE FLOOR,NEXT TO MINISTRY OF HEALTH, OPP TO BURJUMAN
CENTRE AL-SHAFAR BUILDING, BUR DUBAI, EMIRATE OF DUBAI, UAE
TEL: +971-4-396-9999, FAX: +971-4-397-8888

Major Projects < Domestic >

Shield Tunnel Work for Tohbu Kyuryo Railway Line-Fujigaoka~Hanamizuki Section

The Tohbu Kyuryo Railway Line links key stations of Higashiyama Line penetrating center of Nagoya City and Aichi Circular Line by linear motor system. There are sites of EXPO 2005 Aichi along the Railway Line.
Total length of the Line is approx. 9km with 9 stations. Our shield tunnel site is located in the congested outskirts of Nagoya
City. Judging from underground & above ground geological conditions and existing underground structures, the employer Aichi
Prefectural Government came to conclusion that DOT (Double O Tube) method is most suitable. Tunneling details are;
1) Total Tunnel Length: 905m
2) Dimension of Tunnel Section: ø6.73m x W11.43m
3) Excavation Volume: 58,500m3
4) Reinforced Concrete Segment:
W1200; 537 rings
W900; 146 rings
5) Ductile Segment: W600; 206 rings
6) Construction Time: August 2003 - March 2005 (19 months)

introdctionイメージ

Major Projects

Taiwan High Speed Rail Project

Taiwan High Speed Rail Project, which links Taipei and Kaohsiung (350km) in 90 minutes, has been implemented under the largest BOT scheme in the world introducing the latest Japan's Shinkansen technologies. Whole civil works of the Project were ordered to major international contractors dividing into 12 sections in the year 2000.
Daiho's section is located in Hsin Chu Prefecture, third section from the north. Revenue operation is to start in October 2006.

1 Site Location: 80km from Taipei City, Hsin Chu Prefecture
2 Section Length: 17.78km
3 Client: Taiwan High Speed Rail Corporation
4 Type of Contract: Design & Build
5 Design & Construction Time: April 2000-July2004 (52 months)
6 Works:
1) Viaduct/Bridge: 9,284m (Pile ø 2.0m x 936 pcs)
PC Box Girder; 8,746m, Warren Truss; 193m (2 spans)
Composite; 345m (8 spans)
2)Tunnel(NATM): total length of 3,660m (11 tunnels)
3) Tunnel(CUT & Cover): 210m (1 tunnel)
4) Cut & Fill: 4,626m
5) Maintenance Line: 570m

introdctionイメージ

OCAJI Members Overseas

OCAJI members' technology leads the world.

ifawpca founded 1956
Globalsign SSL Site Seal

This site is certified by GlobalSign. The transmitted information from the SSL-enabled page is protected by encrypting.