Package 2 of the Hanoi City Ring Road No. 3 construction project

An elevated limited highway was completed in just 15months, even though the contractual
construction period allowed 30months, by employing labor-saving methods, thus solving the traffic congestion earlier than planned.

Package 2 of the Hanoi City Ring Road No. 3 construction project Image1

The Hanoi City Ring Road No. 3 construction project (composed of three packages) was designed to construct an 8.9-km-long limited highway with two lanes in each direction. Traffic was heaviest in this area of the city and the streets were filled with vehicles and people day and night. The primary requirements of the project were therefore the prevention of third-party damage and the earliest commencement possible of highway service. The project was completed in 15 months, half the contractually permitted period of 30months, owing to various labor-saving measures in the construction of substructure, pier heads and superstructure, and such measures as the adoption of 60-ton gantry cranes.

Other Civil Engineering Projects
OCAJI Members Overseas

OCAJI members' technology leads the world.

ifawpca founded 1956
Globalsign SSL Site Seal

This site is certified by GlobalSign. The transmitted information from the SSL-enabled page is protected by encrypting.